Handsworth Methodist Church
an awareness to worship, a response of service
-
Photos of building work Feb 2011
- removal of the outside steps
- outside steps removed
- work to fill over the stair well
- work to fill over the stair well
- outside steps removed and stair well covered over
- starting to create the space for outside door
- showing on teh right the doorlevels lowered
- showing the balcony steps truned round and enclosed
- showing balcony step removed and doorway created for new lift
- view from teh old kitchen looking up to the vestry which is where the new staircase will be
- a new vestry is created in the balcony
- a new vestry is created in the balcony
- showing the new serving hatch and ramp from sanctuary level floor
- showing work to enclose the back stair case and filling in the middle window
- last look at the pantomime scenary
- the waterproofing work had to take off much of the old plaster















